AP 150 MW DCR Tender Result

In a recent open bid for 150 MW Solar PV Power Projects in the Indian state of Andhra Pradesh with Domestic Content Requirement wherein the developers are required to source the solar equipment from India, Azure Power won 100 MW Project quoting lowest tariff of Rs.5.12 kWh and Adani won 50MW Project quoting Rs. 5.13/kWh.

The other unsuccessful bidders were Red (Indiabulls) quoting Rs.5.14, Hero – Rs.5.25, Acme – Rs.5.36, Tata – Rs.5.41, NEEPCO – Rs.5.70, Greenko – Rs.5.79, Renew Power – Rs.5.99 and finally SkyPower Rs.6.62.


Sl No. Bidder' Name Bid Price Bid Quantity (MW) Allotted Quantity (MW)
1 Azure Power India Pvt Ltd 5.12 2 Projects (100 MW) 2 Projects (100 MW)
2 Prayatna Developers Pvt Ltd (Adani) 5.13 3 Projects (150 MW) 1 Project (50 MW)
3 Yarrow Infrastructure Limiyted (IndiaBulls) 5.14 1 Project (50 MW) Nill
4 Hero Solar Energy Pvt Ltd 5.25 2 Projects (100 MW) Nill
5 ACME Solar Holding Pvt Ltd 5.36 1 Project (50 MW) Nill
6 Tata Power Renewable Energy Limited 5.41 3 Projects (150 MW) Nill
7 NEEPCO Ltd 5.70 1 Project (50 MW) Nill
8 Greenko Energies Pvt Ltd 5.79 1 Project (50 MW) Nill
9 ReNew Solar Power pvt Ltd 5.99 1 Project (50 MW) Nill
10 SkyPower SouthEast Asia Holdings 2 Ltd 6.62 2 Projects (100 MW) Nill